They are preparing the north side for attaching the plastic material used for water control.

You can see how muddy the southwest corner of the church was under the ramp.

The ramp and steps have been moved from the front of the church.

The strengthening beam on the north side of the church has been poured.

You can see how much water has been soaking in and standing at the northwest corner of the church. As they attempted to dig the trench down the front side, they were faced with lots of water and mud.