Construction has begun on the inside of the church. This is the view upon entering the church. The carpet has been taken up and they have begun to cover everything with plastic. You can see the posts and ceiling fans are already covered with plastic.


The Altar steps have been removed. You can see that there is rock showing on the floor under the altar. The remainder of the altar will be left intact, but covered for protection during construction.


They dug a hole in the floor to see what exists around the pillars. It seems that rocks were stacked up to support the pillars. In the pillar areas, around those support rocks, there seems to simply be dirt under the 4 inch slab. You can see where the hole is and a close up of what they found.