Tuesday, January 19, 2010

More concrete beams on South Side of Church





More beam work on the south side of the church. You can see the concrete footings that were poured last week, and the long beam built on top of the footings, and finally, the concrete after being poured into the long beam.

No comments:

Post a Comment