Friday, January 22, 2010

A New Pad




On Friday, the foundation was poured for the new air conditioner pad. An unmarked, gas line, that was buried very shallow (about 4 inches underground), was cut while digging, and thank the Lord that no damage was done. The leak was safely contained and work continued.