As you can see, we are getting very close to completely the foundation work on the outside of the church.
On the sides where footings have been poured, such as the North side shown here, plastic material has been laid down to protect against future water problems.
You can also see the front of the church, the last remaining side in need of foundation work, where they have began digging to prepare for more footings.
Yesterday, they removed the gas line pipe which goes up the back of the church to connect to the furnace.
Finally, a photo shows the north side of the church being complete, with plastic installed and now all covered back up.
You can also see the front of the church, the last remaining side in need of foundation work, where they have began digging to prepare for more footings.
Yesterday, they removed the gas line pipe which goes up the back of the church to connect to the furnace.
Finally, a photo shows the north side of the church being complete, with plastic installed and now all covered back up.